A massive data center could be headed to the town of Bow, according to Federal Energy Regulatory Commission filings and a social media post from New Hampshire’s consumer advocate.

The public filings describe an agreement for a preliminary, exploratory study on the “viability” of connecting a 350-megawatt project to the grid. The study, according to the filings, was to be conducted by Eversource Energy, which owns the region’s electric transmission system, at the request of Granite Shore Power, LLC, owner of Merrimack Station, a former coal-fired power plant in Bow. 

Originally published on newhampshirebulletin.com, part of the BLOX Digital Content Exchange.

(0) comments

Welcome to the discussion.

Keep it Clean. Please avoid obscene, vulgar, lewd, racist or sexually-oriented language.
PLEASE TURN OFF YOUR CAPS LOCK.
Don't Threaten. Threats of harming another person will not be tolerated.
Be Truthful. Don't knowingly lie about anyone or anything.
Be Nice. No racism, sexism or any sort of -ism that is degrading to another person.
Be Proactive. Use the 'Report' link on each comment to let us know of abusive posts.
Share with Us. We'd love to hear eyewitness accounts, the history behind an article.