A massive data center could be headed to the town of Bow, according to Federal Energy Regulatory Commission filings and a social media post from New Hampshire’s consumer advocate. The public filings describe an agreement for a preliminary, exploratory study on the “viability” of connecting a 350-megawatt project to the grid. The study, according to […]
CONWAY — Despite heavy rains and gusty winds last Friday, Conway fared relatively well with Winter Storm Elliott. In Ossipee, however, nearly …
CONWAY — After Winter Storm Diaz dumped a foot or more of snow on the Mount Washington Valley last weekend, knocking out power to thousands of…
CONWAY — A big, slow-moving storm caused power outages affecting thousands of residents and businesses in the Mount Washington Valley.
CONWAY — Businesses were left without power for nearly two hours in parts of North Conway Monday evening after a failure at a transformer subs…
CONWAY — High schoolers across the state are planning a “climate strike” event Friday, calling for a New Hampshire coal-fired plant to be shut…
CONWAY — Saturday’s nor'easter, which pummeled the central part of the state, particularly Rochester and Wakefield, with wet, heavy snow, brou…
FRYEBURG, Maine — The Fryeburg Planning Board Tuesday evening approved a 94-acre solar project that, when fully built will create 17 megawatts…
PLYMOUTH — New Hampshire Electric Cooperative has announced that it will hold its Co-op Power rate steady at the current level for the summer …
There are two power blocs driving politics today. First, there’s the proletariat. These are the working-class voters who go to Trump rallies i…
